Hills District Kitchen Renovation Questions

What Hills homeowners ask before they renovate a kitchen.

Licence and insurance details are provided on your discovery call, or whenever you ask. Request them →

Budget

The cost guide shows 2026 bands for makeovers, replacements, custom kitchens, showpiece kitchens, butler's pantries and alfresco kitchens.

Makeover or renovation

If the layout works and the cabinets are sound, a kitchen makeover may be enough. If you need more storage, an island or a scullery, choose a full renovation.

Timing

Most of the time is spent on design and manufacture. On site, expect three to five weeks. See the process.

Entertaining

A generous island, a hidden butler's pantry and a clear path to the alfresco kitchen make the biggest difference for families who host.

Benchtops

Engineered stone is banned. See benchtops and splashbacks for alternatives.

Older homes

Homes built or renovated before about 1990 are checked for asbestos before demolition. Older switchboards may need upgrading for induction.

Approvals and strata

Internal work is usually exempt, structural work may need approval, and townhouses and apartments need owners corporation approval.

Who does the work

Kitchen renovation work is carried out in partnership with Coastal Renovation Group, a licensed NSW builder. Licence and insurance details are provided on request and can be verified on the NSW public register.

Call 02 4404 0243 or share your kitchen plans.

FAQs

Questions people ask before they commit

What does a kitchen renovation cost in the Hills District?

As a 2026 guide: makeover $14,000–$24,000, replacement $24,000–$38,000, custom with island $38,000–$60,000, showpiece with butler's pantry $60,000–$110,000 or more.

How long are we without a kitchen?

Typically three to five weeks on site, because cabinetry is made before demolition.

Can we have engineered stone?

No. Engineered stone has been banned in Australia since 1 July 2024. Porcelain, natural stone, solid surface, timber and laminate are the main alternatives.

Do we need council approval?

Internal kitchen renovations are generally exempt development unless structure changes. Load-bearing walls need engineering and may need approval. Strata properties need owners corporation consent.

What deposit is allowed in NSW?

The maximum deposit is 10 per cent. For work over $20,000, home building compensation cover must be in place before a deposit is requested.

Who does the work?

Kitchen renovation work is carried out in partnership with Coastal Renovation Group, a licensed NSW builder. Licence and insurance details are provided on request.

Free, no-obligation

Get your free quote today

Start Your Kitchen Design Quote

Hills Kitchens Call 02 4404 0243 Free measure & quote
Call 02 4404 0243